Useful Links

Haines 16R restoration

 

   <- Previous     Bulkheads installed    Next ->  
Here are two of the new bulkheads installed. These are in place for the two storage sections in the floor. The bow storage section is a fish kill box and the stern section is the for the under deck tank. The bulkheads were laminated from two pieces of 12 mm plywood with a layer of 450 gm chop strand mat between.

 
Comments: