The pipe was installed using probond into a predrilled 44mm hole with a hole saw. The PVC will be trimmed flush with the bulkhead and a bung installed in the PVC. The PVC elbow was bedded down with some more probond and then a couple of strip of chop strand matting were used to secure the PVC to the hull. Hopefully this pipe will never move.