Useful Links

Family Room Makeover and Remodeling Project

 

   <- Previous     Finished Step    Next ->  
The new step is covered with the Ash flooring. The edge of the tread is made from Bull Nose ordered with the flooring. The baseboard heat pipe passing through the step is also boxed in using flooring. The finish wall trim on either side of step is not installed in this photo.

 
Comments: