Getting the floor ready. Used exterior grade Douglas Fir plywood, sealed it with resin. Reinforced the ski locker opening by adding another layer of ply around the opening. Screwed the floor to the stringers with SS deck screws and glued it down to the stringers with 5200. The floor was tabbed to the hull and then covered with a layer of matt. Afterwards I gave it another coat of resin and glued down a vinyl floor.