Useful Links

SHANANA

 

   <- Previous     Stbd Aft Side Deck    Next ->  
The Stbd side deck had substantial rework done to repair damage from dry rot.
The whole deck was removed for 18" fwd of the transom.
Everything was detached from the transom and replaced with new timber etc.
This was a lot more work than what was needed on the oppposite side (above).
The inner coaming has been replaced with new ply and is now very solid.

 
Comments: