Useful Links

Reassembly

 

Base frame

The base frame is ready for assembly.

 

Roll bar

The first thing to be assembled is the roll bar. The front bars are assembled with the front plate.

 

Frame and front bars

The front bars are reattached to the frame. The bolts are not tightened until all the parts are installed.

 

Rear bar next

The top plate and rear bar are next to go on. Once everything is installed and the bars are squared up, all bolts are torqued.

 

Frame assembled

Some foam pipe insulation was installed on the bars next to where the seat goes. This will help cover the bolts and give a little padding. The frame appears to be growing with the bars installed. The dog likes it.

 

Spindles

The spindles are reassembled with new hardware. The pivit points are greased up with a moly grease.

 

Tie rods

Tie rods are greased and installed. Final adjust will be made after everything is together. The steering shaft was also oiled.

 

Front suspension

The front suspension is complete. Final adjustments will be done when the cart is completed.

 

Engine installed

The new Tecumseh 5 HP engine is installed.

 

Axle and torque converter

The clutch was changed out for a Comet Torq-A-Verter to get the most out of the engine. The engine was shimmed too much in this photo, and has been corrected.

 

Rolling chassis

The tires are installed so the kart can be put on the ground while waiting for other parts.

 

Floor mat

A rubber floor mat was made and glued to the floor for a finished look.

 

Steering wheel

The wheel is bolted on. The stop switch was mounted on the wheel for easy control in case the cart needs to be shut down quickly.

 

Switch

The wiring to the switch were routed through the frame to the rear of the cart.

 

Seat

The seat is bolted in. This is a Manco seat and head rest, so everything lined up fine. I had to drill a hole on the mount strap that was replaced on the frame.

 

Brake

The brake band is bolted up and connected to the control rod. A return spring is added to retract the band.

 

Brake pedal

The brake rod is assembled to the pedal. There are extra holes in the pedal and rod to make adjustments as the brake band wears.

 

Throttle hook up

The throttle cable is assembled to the engine. The control was changed from the "lawn equipment" hand control to a Power Sport unit that allows a cable to operate it, and spring back to idle.

 

Throttle pedal

The throttle is assembled at the pedal. The cable is adjusted for full actuation of the engine control. A return spring is installed to ensure full throttle closure. There is a spring on the engine control, but the second one is for extra safety and a better feel.

 

Complete

This cart is done aside from some testing and tuning. Some more minor adjustments and tweaking is needed.